Skip Navigation LinksSafety-Related Pilot Upgrade - prev
 new name Safety-Related Pilot Upgrade
old name Safety Related Instrumentation and Control

Description
  
  
  
  
  
  
This research report describes the process followed during the SR I&C pilot project conceptual design phase and portions of the detailed design phase.
  
6/14/2023Safety-RelatedInstrumentationControlPilotUpgrade.pdf
Checked Out To: Jodi L. VollmerSafety-RelatedInstrumentationControlPilotUpgrade.pdf
Checked Out To: Jodi L. Vollmer6/14/2023 2:23 PMJodi L. VollmerSafety Related Instrumentation and Control
This research report describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and captures lessons learned.
  
11/1/2020Initiation_Phase_Implementation_Report.pdf
Checked Out To: Jodi L. VollmerInitiation_Phase_Implementation_Report.pdf
Checked Out To: Jodi L. Vollmer4/11/2022 12:38 PMJodi L. VollmerSafety Related Instrumentation and Control
The commercial nuclear sector faces unprecedented financial challenges driven by low natural gas prices and subsidized renewables in a marketplace that does not reward carbon-free baseload capacity.
  
11/1/2020Business_Case_Analysis_Digital_Safety-Related.pdf
Checked Out To: Jodi L. VollmerBusiness_Case_Analysis_Digital_Safety-Related.pdf
Checked Out To: Jodi L. Vollmer4/11/2022 12:38 PMJodi L. VollmerSafety Related Instrumentation and Control
LWRS Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade​.
  
5/1/2020Vendor-Independent_Design_Requirements.pdf
Checked Out To: Jodi L. VollmerVendor-Independent_Design_Requirements.pdf
Checked Out To: Jodi L. Vollmer4/11/2022 12:39 PMJodi L. VollmerSafety Related Instrumentation and Control