Risk-Informed Systems Analysis (RISA) Stakeholder Engagement Meeting
2024 RISA Stakeholder Engagement Meeting
November 12-13, 2024
Day 1
- 1.3 Overview of Risk-Informed Systems Analysis Pathway (RISA)
- 2.2 Safety Analyses for Power Uprates
- 3.1 Plant Reload Optimization – Framework Overview
- 4.1 System Engineer Approach to Capture and Analyze Equipment Reliability Data
- 4.2 Use of Artificial Intelligence to Mine Operator Logs for Availability and Reliability
- 4.3 Methods and Tools To Assess Robustness of Nuclear Plant Outages
Day 2
- 5.1 Digital I&C Risk Assessment Methodology Refinements and Improvements
- 5.2 Methodology for Software Failure Quantification
- 5.3 Testing Generative Artificial Intelligence-based Foundation Models for Digital I&C Design Tasks
- 5.4 Assessing Digital Human-System Interfaces Based on Redundancy-Guided Systems-Theoretic Hazard Analysis and Human Reliability Analysis
- 6.1 Dynamic Risk Analysis Using EMRALD - Improvements and Use Case
- 7.1 Introduction to Rancor-HUNTER and a Demonstration of Rancor-HUNTER
- 7.2 Building a Virtual Operator through Computerized Procedures
- 7.3 Analyzing Time Distribution Data for HUNTER
- 7.4 Objective Parameter-Based Evaluation of the Experience and Training Performance Shaping Factors in HRS